Project Info
Project Description
Microwave link Installation with aliment and testing for 9mobile at IHS Abuja
installation includes:
- Rooftop, tower or monopole locations through use of riggers (crane, bucket extra)
- Installation of dish antenna on existing antenna mast
- Installation of ODUs and IDUs as per link design
- Running, labeling and securing of required cables (Cat5e, IF, fiber, power)
- Termination of connectors at ODU and IDU ends, with assurance of connectivity, strain relief, taped/waterproofed/tie wrapped.
- Installation of grounding cable
- Installation of DC power cable from customer provided power source and breakers
- Validation of correct power and grounding of system
- Validation all of cables through cable testers
- Confirmation of installation quality through established punch-list
- Detailed photographs of installation
- Comprehensive MOP – outlining installation procedures and configuration details